Skip to content

Behind the numbers— the arithmetic, sourced.

What each quantity means, how it is calculated, and where the figures that are not arithmetic actually come from. Every page supports specific calculators and carries its sources.

  1. 01

    Soil compaction, shrinkage and swell

    Two different factors for the same soil, and published tables that disagree with one another. What FHWA, DOT and textbook tables actually say, the ±33% caveat two of them carry, and the arithmetic.

    Read the guide
    SupportsCONTENT-MAP B3 · updated 2026-09-30
  2. 02

    Bank vs loose cubic yards

    A bank yard is earth in the ground; a loose yard is the same earth in a truck, and there is more of it. Swell, load factor and the three volumes on one job.

    Read the guide
    SupportsCONTENT-MAP B1 · updated 2026-09-30
  3. 03

    How thick should a concrete slab be

    The IRC and IBC set 3 1/2 in for concrete floor slabs on the ground and, in the sections reviewed, nothing for driveways or patios. Four local and state documents quoted with the part of the driveway each covers, and how thickness changes the concrete you order.

    Read the guide
    SupportsCONTENT-MAP B13 · updated 2026-09-29
  4. 04

    Rebar size chart

    Nominal diameter, area and weight per foot of bars #3 to #18 from state DOT tables, the soft-metric sizes #10 to #57, metric conversions, and where the published tables disagree.

    Read the guide
    SupportsCONTENT-MAP B12 · updated 2026-09-29
  5. 05

    How to calculate rebar for a concrete slab

    Count the bars each way from the spacing and cover, add the lengths, weigh them from a published bar table, and count the sticks after splices. Worked for a slab, with the inputs only your drawings can supply.

    Read the guide
    SupportsCONTENT-MAP B11 · updated 2026-09-29
  6. 06

    Excavation volume with sloped sides

    The prismoidal formula worked for a pit with battered walls, and how far off the common shortcuts are: averaging the top and base, or ignoring the slope.

    Read the guide
    SupportsCONTENT-MAP B10 · updated 2026-09-29
  7. 07

    How to calculate trench volume

    Trench volume is the cross-section times the length. Vertical and sloped walls, why laying the walls back adds volume quickly, and how spoil and backfill differ from the excavation.

    Read the guide
    SupportsCONTENT-MAP B9 · updated 2026-09-29
  8. 08

    Tri-axle dump truck capacity

    Legal weight comes from a published federal formula on the axles, and the load is what is left after the truck’s own weight. The bridge formula, worked.

    Read the guide
    SupportsCONTENT-MAP B8 · updated 2026-09-29
  9. 09

    Gravel driveway depth

    No national standard for gravel driveway depth was found in the sources reviewed. What the FHWA handbook and the Gravel Roads manual say for unpaved roads, why a driveway differs, and how any depth becomes yards and tons.

    Read the guide
    SupportsCONTENT-MAP B5 · updated 2026-09-29
  10. 10

    Dump truck capacity in cubic yards

    Two limits decide how many yards a truck carries — the body volume on its plate and the payload its weight rating allows. The material decides which one binds. Includes dump-body specifications as two manufacturers print them.

    Read the guide
    SupportsCONTENT-MAP B4 · updated 2026-09-29
  11. 11

    How cut and fill is calculated

    The grid method step by step, the average-end-area and prismoidal formulas for cross-sections, and why area times average depth gets a balanced site wrong.

    Read the guide
    SupportsCONTENT-MAP B2 · updated 2026-09-03
  12. 12

    Markup vs margin in construction

    Markup is a percentage of cost, margin is a percentage of price. The conversion formulas, a worked example and the full table.

    Read the guide
    SupportsCONTENT-MAP B6 · updated 2026-09-01